logo
 
 
nav home
Public relation > News > Gallery >
 

Building Base Is Reinforced

 


The reinforcement  works of the deteriorated building base located in Tsulukidze blind alley # 5  is on by the  initiative of the local administrative body of Isani-Samgori region. Temur Grigalashvili, the administrator of the region visited the site of rehabilitation.

As Mr. Temur says , on the perimeter   of the base,  18 piles were arranged on 10 meter height. Accordingly the  iron -concrete supportive rell and tiles were arranged   following  the project. The  building was plastered and strengthened . Now the building is completely safe.

 The resident s cooperation of the building appealed to the local administrative body to reinforce the base of the above building. It started the works  of reinforcement as soon as it was appealed to. The base is now strengthened , the armature net is arranged and the supportive wall is  reinforced with concrete-iron. The building is reroofed and the water collectors  are also changed.

“Our building was too deteriorated to move in it. We daily waited for its disruption , our great thanks to the local administrative body for fulfilling our demands, now we are safe, “- says Mariana  Oganeozva, the local resident.

The administrator of the region  promised the residents to repair the inter deteriorated stairs.